So my client has 2 sites built at different times
One is sitting on V7
and the other on V8
The plan is to merge the 2 together into one Umbraco 13 build so she can manage them both from a single login.
The v8 one is way more complex in terms of code and functionality so I would use that as the base .
What would be the best approach to then merge the v7 one into that?
I feel like the v7 one might be a case of getting the core structure in and then re-adding content using the